Trade show budget planner

Add up every line of a trade show, from booth space to the hotel bill, and see what it costs per day, per lead and per meeting before you sign the contract.

Your show

Example values
Show and space

Exhibit days, used for the per-day figure and meals.

Floor space or the exhibitor package from the organizer.

Design, build, graphics and furniture, or a rental booth.

Freight both ways plus material handling at the venue.

Wired or Wi-Fi connection, screens and AV rental.

Scanner rental or app licenses for this show.

People

People traveling to work the booth.

Flights, trains and ground transport, round trip.

Multiplied by staff and show days.

Marketing and buffer

Email, ads, invitations and meeting-setting before the show.

Session slots, branding, app ads or a hosted happy hour.

Added on top of everything else for surprises.

Results you expect

Leave empty to skip cost per lead.

Leave empty to skip cost per meeting.

$76,362$25,454 a day

Total trade show budget

$76,362

Includes $6,942 contingency on a $69,420 subtotal.

Per show day
$25,454
Travel, hotel and meals
$13,620
18% of the total
Cost per lead
$305
Cost per meeting
$2,545

Where the money goes

  • Booth space24%$18,000
  • Booth build20%$15,000
  • Shipping, electrical, internet and AV13%$10,000
  • Lead retrieval1%$800
  • Travel and hotel16%$12,000
  • Meals2%$1,620
  • Giveaways and swag4%$3,000
  • Pre-show promotion5%$4,000
  • Sponsorship add-ons7%$5,000
  • Contingency9%$6,942

The maths runs in your browser and we don't save your inputs. They're kept in the page URL so you can share the result.

How it works

The calculator adds your line items, puts contingency on top and divides by days, leads and meetings. The worked example below uses the default example inputs in US dollars. Switching currency only changes the symbol, it doesn't convert.

Travel and hotel

staff × travel per person + staff × hotel nights × hotel per night

Everyone who works the booth needs to get there and sleep somewhere.

Example: 6 × $600 + 6 × 4 × $350 = $12,000

Meals

staff × show days × meals per person per day

Example: 6 × 3 × $90 = $1,620

Subtotal

space + build + shipping + electrical + internet and AV + lead retrieval + travel and hotel + meals + swag + promotion + sponsorship

Example: $69,420

Contingency

subtotal × contingency %

A buffer for the costs nobody quoted you: overtime labor, extra drayage, rush shipping.

Example: $69,420 × 10% = $6,942

Total

subtotal + contingency

Example: $76,362

Cost per day

total ÷ show days

Example: $76,362 ÷ 3 = $25,454

Cost per lead and per meeting

total ÷ leads expected, and total ÷ meetings expected

Left empty, these show n/a rather than dividing by zero. To judge whether those numbers pay off, take them to the cost per meeting calculator.

Example: $76,362 ÷ 250 = $305 per lead; $76,362 ÷ 30 = $2,545 per meeting

For context: what the research says

Published figures to sanity-check your inputs. They describe the market, not your event, so use your own numbers above. More in our event marketing statistics.

FAQ

What should a trade show budget include?
Booth space, booth build or rental, shipping and drayage, electrical, internet and AV, lead retrieval, travel and hotel for every staffer, meals, giveaways, pre-show promotion, any sponsorship add-ons and a contingency buffer. Teams that only budget for space and booth usually overspend once logistics and travel land.
How much contingency should I add to a trade show budget?
There's no fixed rule. The example uses 10% of the subtotal to cover rush fees, extra drayage, damaged graphics and last-minute travel changes. Go higher for a first-time or international show, where more of the costs are unknown. The calculator applies the percentage to everything else you enter.
What is drayage?
Drayage, or material handling, is the fee the show's general contractor charges to move your freight from the loading dock to your booth and back. It's usually billed by weight, so it can be a large share of shipping costs for heavy booths.
How do I calculate cost per lead for a trade show?
Divide the total show cost, including travel and contingency, by the number of leads you capture. Cost per meeting works the same way with meetings held. Use the fully loaded cost, or the number will look better than it is.
Are the default numbers typical trade show costs?
No. They're example values to show how the calculator works, not benchmarks. Replace them with quotes from your exhibitor manual, contractor and travel team.